About This Trail
The profile is essentially flat — 84% of the 6.6 miles sits under a 1% grade, for 16 ft of total gain. You finish 125 ft below the start, so an out-and-back saves the climbing for the return.
The route passes Len Hester Park at mile 3.4. Marked facilities along the route include drinking water.
Trail data © OpenStreetMap contributors, available under the Open Database License. Contributed by volunteers and not verified by GoalRival — it may be incomplete or out of date. Background reading: this trail on Wikipedia.
Background
The Iron Horse Regional Trail is a rail trail in the East Bay Area in California. This trail is located in inland central Alameda and Contra Costa counties, mostly following a Southern Pacific Railroad right of way established in 1891 and abandoned in 1977. The two counties purchased the right of way at that time, intending to use it as a transportation corridor; the Iron Horse Trail was first established in 1986. In 2003, BART proposed to also use the right-of-way for a DMU line from Walnut Creek station to Tracy via Pleasanton.
Text from Wikipedia, available under CC BY-SA 4.0.
How It Compares
At 6.7 miles, it is the 2nd longest of 39 trails mapped in Contra Costa County.
Surface Breakdown
Cuesheet
- 0.0 miStart of Route0
- 2.7 miWater Fountain−76ft
- 3.4 miLen Hester Park−10ft
- 6.7 miEnd of Route−59ft
Reviews & Comments
No reviews yet. Be the first.