HomeLos AngelesRail to Rail
urbaneasypavedeBike OKLocal network

Rail to Rail

Vermont-Slauson · Los Angeles, CA
1.97mi
Distance
20ft
Elev Gain
%
Avg Grade
%
Max Grade
187ft
Max Elev
167ft
Min Elev
Elevation Profile167–187 ft

About This Trail

The profile is essentially flat — 88% of the 1.9 miles sits under a 1% grade, for 20 ft of total gain.

Vermont-Slauson, Los Angeles, California 90003
OSM verified
0 reviews
Surface quality: excellent

Trail data © OpenStreetMap contributors, available under the Open Database License. Contributed by volunteers and not verified by GoalRival — it may be incomplete or out of date. Background reading: this trail on Wikipedia.

Background

Rail to Rail
Photo: ROTRANSIT, CC0, via Wikimedia Commons

The Rail to Rail Active Transportation Corridor Project constructed a rail trail in Los Angeles County, California, United States. It was constructed and is owned by Los Angeles Metro.

Text from Wikipedia, available under CC BY-SA 4.0.

How It Compares

It is flatter than 85% of trails in Los Angeles.

Browse all trails in Los Angeles

Surface Breakdown

Paved2.0 mi · 100%

Cuesheet

  • Start of Route
    0
    0.0 mi
  • End of Route
    +20ft
    2.0 mi

Reviews & Comments

No reviews yet. Be the first.