About This Trail
The 2.4 miles roll continuously through 4 distinct climbs, adding up to 462 ft of gain without one dominant ascent. The main climb starts around mile 1.4 and runs 1.0 miles, gaining 190 ft at an average 3.5%. The steepest sustained pitch averages 15% and begins just past mile 0.98. You finish 200 ft above the start, so the return trip runs mostly downhill.
Trail data © OpenStreetMap contributors, available under the Open Database License. Contributed by volunteers and not verified by GoalRival — it may be incomplete or out of date. Background reading: this trail on Wikipedia.
Background

The High Bridge Branch is a branch line that was operated by the Central Railroad of New Jersey (CNJ). As built, the branch started in High Bridge, New Jersey at a connection with the CNJ main line and continued north to iron-ore mines in Morris County. The High Bridge Branch line followed the South Branch Raritan River for much of its length.
Text from Wikipedia, available under CC BY-SA 4.0.
How It Compares
At 2.5 miles it is longer than 86% of the 37 trails mapped in Mount Olive.
It climbs more per mile than 81% of trails in Mount Olive.
Surface Breakdown
Cuesheet
- 0.0 miStart of Route0
- 2.5 miEnd of Route+302ft
Reviews & Comments
No reviews yet. Be the first.