About This Trail
The 1.9 miles roll continuously through 3 distinct climbs, adding up to 180 ft of gain without one dominant ascent. The main climb starts around mile 0.55 and runs 0.12 miles, gaining 76 ft at an average 12%. You finish 39 ft below the start, so an out-and-back saves the climbing for the return.
Trail data © OpenStreetMap contributors, available under the Open Database License. Contributed by volunteers and not verified by GoalRival — it may be incomplete or out of date. Background reading: this trail on Wikipedia.
Background

The Putnam County Trailway is a paved 12-mile (19 km) bicycle and pedestrian trail in Putnam County, New York. With few exceptions, it follows the former right-of-way of the New York and Putnam Railroad from the northern end of the North County Trailway at the Putnam County line in Baldwin Place north, then east, to Carmel. In 2011 the trail was extended east to Brewster. In late summer 2018, a final section bypassing portions of Putnam Ave in Brewster, which was formerly closed off with construction barriers and signs, has been opened. The Brewster station of the Metro-North Railroad is a short distance away.
Text from Wikipedia, available under CC BY-SA 4.0.
How It Compares
At 2.0 miles it is longer than 85% of the 41 trails mapped in Town of Cortlandt.
Surface Breakdown
Cuesheet
- 0.0 miStart of Route0
- 2.0 miEnd of Route−69ft
Reviews & Comments
No reviews yet. Be the first.