About This Trail
The climbing is back-loaded — the 2.9 miles stay comparatively easy before most of the 43 ft of gain arrives late. The main climb starts around mile 1.9 and runs 1.0 miles, gaining 43 ft at an average 0.8%.
Trail data © OpenStreetMap contributors, available under the Open Database License. Contributed by volunteers and not verified by GoalRival — it may be incomplete or out of date. Background reading: this trail on Wikipedia.
Background

The Banks–Vernonia State Trail is a paved rail trail and state park in northwest Oregon in the United States. It runs for 21 miles (34 km), primarily north–south, between the towns of Vernonia in Columbia County and Banks in Washington County on an abandoned railroad bed. Banks is about 25 miles (40 km) west of Portland.
Text from Wikipedia, available under CC BY-SA 4.0.
How It Compares
At 3.0 miles it is longer than 89% of the 46 trails mapped in Washington County.
It is flatter than 89% of trails in Washington County.
Surface Breakdown
Reviews & Comments
No reviews yet. Be the first.